John Garcia, Regional Project Manager
A: My favorite job so far was installing brick pavers at Lot L of U.S. Cellular Field in Chicago, Illinois.
2. When did the job begin? A: In the Fall of 2007.
3. How long did the job last?
A: We were on site over 10 weeks. During that time, we excavated 75,000 sq ft and installed over 20,000 sq ft of brick pavers every day, covering a total of 265,000 sq ft (or 4.5 football fields).
4. Why did you enjoy it so much?
5. Were there any complications?
A: Yes, we encountered several obstacles; but, our entire crew was tenacious and our teamwork and engineering paid off in the end. We overcame permitting and union issues, we dealt with a temporary job shut-down and weather-related delays, the brick pattern had to be adjusted last-minute, and we had to re-route power to the viaduct once the telephone poles were removed.
6. Was the client satisfied?
A: The Illinois Sports Facilities Authority (ISFA) was very satisfied with the outcome. With this lot and their other eco-friendly initiatives, ISFA is leading the green movement in Chicago and in the Major Leagues.
7. What did you learn from this experience?
Installing paver bricks at Lot L